by Zygmunt Gorski | Dec 21, 2018 | News
On December 19, 2018 Gorski Consulting completed another videotaping session along Highway 401 at the Kenessarie Road site just east of Chatham Ontario. This now completes four sites that have been videotaped this fall. The site locations are shown in the figure...
by Zygmunt Gorski | Dec 21, 2018 | News
The installation of a High Tension Cable Median Barrier (HTCMB) in the 118 kilometre distance of Highway 401 between Tilbury and London Ontario has been controversial in that some groups have been lobbying for the installation of a concrete, Jersey-type barrier as...
by Zygmunt Gorski | Dec 20, 2018 | News
An unintended veering out of a travel lane can be the cause of traffic disruptions that ultimately lead to a collision. Collision Reconstructionists who examine the post-collision evidence are rarely able to detect the physical evidence of such an action because, for...
by Zygmunt Gorski | Dec 20, 2018 | News
Another median crossover incident occurred on Highway 401 just east of Downie Road on December 17, 2018. This is significant because the involved tanker truck struck the High Tension Cable Median Barrier (HTCMB). The HTCMB is being installed along the 188 kilometre...
by Zygmunt Gorski | Dec 17, 2018 | News
Why was a transport truck stopped on the westbound Highway 401 in a construction zone near the James Snow Parkway near Milton Ontario when it was rear-ended by a mini van resulting in major injuries to the two occupants of the the van? The official news media provided...