by Zygmunt Gorski | Aug 28, 2022 | News
A detour of the Thames Valley Parkway in London Ontario has caused cyclists to travel through undesirable road conditions such as this narrowing of Talbot Street as it travels through the underpass of the Canadian Pacific Railway line. Construction detours are a...
by Zygmunt Gorski | Aug 26, 2022 | News
This view of the Red Hill Valley Parkway in Hamilton Ontario was taken in September, 2020, at a time when its posted maximum speed was reduced to 80 km/h. Officials believed this was necessitated due to the perceived safety problems that became reported over several...
by Zygmunt Gorski | Aug 21, 2022 | News
We can’t show you the burnt out vehicle or collision site where 3 persons perished on Conestoga Drive in Brampton on August 20, 2022, because those photos are copyright. And you don’t need to know how or why those fatalities occurred. So here is a picture...
by Zygmunt Gorski | Aug 20, 2022 | News
Proposed construction at the Thames Valley Parkway in the City of London has necessitated a detour route. The original detour, encompassing Talbot St and Grosvenor Street met with opposition from users who proposed an alternate route by way of Gunn Street. Initially...
by Zygmunt Gorski | Aug 18, 2022 | News
This City of London map shows a double-choice detour they advise for cyclists to take around construction of the Thames Valley Parkway in London which is to commence on August 22, 2022. Cyclists have warned that taking the originally-proposed detour is dangerous yet...