“Cargo” Biking With No Brakes?

What happens when you want to ride a cargo bike? When it is not fitted to be a cargo bike bad things happen.

The above photo was taken in August of 2025 on Dundas Street in east London Ontario as a cyclist decided he could carry a large box on the handlebars of his bicycle. Controlling the loose cargo means that his hands are not available for other purposes, like braking. While approaching a pedestrian crossing he is unable to brake for a pedestrian who thought she had the right-of-way, as shown below.

The cyclist carrying a large box on his handlebars is unable to use his brakes for a pedestrian using a crosswalk in front of him.

The only thing that saved him from striking the pedestrian is that he planted his right foot on the ground and used that as his brake.

Carrying cargo by bike is efficient in many circumstances but dangerous when it interferes with basic actions needed to control the bike. In many instances there is little or no attention paid to bike braking even when the bike is a genuine cargo bike. And the same point holds true for other vehicles such as e-bikes and e-scooters. The ability to apply braking is a fundamental and essential matter that must be considered before any vehicle, motorized or not, is allowed on a public roadway.

Clarke Road Traffic Bottleneck Causes More Than Just Resident Complaints

This northward view along Clarke Road in London Ontario was taken at 0900 hours on August 5, 2025. It shows the traffic south of the Fanshawe Park Road intersection. Residents just to the north of this area have raised complaints about the heavy traffic, including many heavy trucks, being funneled onto their road which is not designed from that purpose.

High volumes of traffic, including many heavy trucks, have come to plague local residents along Clarke Road in the north-east end of the City of London. Gorski Consulting has become aware of one of those complaints made to the City and thus additional analyses have recently been conducted. This site contains a long history of study by Gorski Consulting for a number of reasons. That history will be reviewed before details of the latest analysis will be presented.

Site Features

Clarke Road in an arterial roadway that runs north/south at the north-east edge of London, Ontario. Presently the site of concern is an extension of the Veterans Memorial Parkway (VMP) which is described as a north-south municipal expressway at the east end of the City. It is convenient for heavy vehicle traffic to travel from the Highway 401 expressway, onto the VMP and then northward onto Clarke Road to locations north of the City. Similarly southbound trucks can use the same convenient route to reach the VMP and then onto Highway 401 or destinations to the south.

This Googlemaps view shows how northbound heavy truck traffic can travel along Veterans Memorial Parkway onto Clarke Road, or southbound trucks can follow the same route.
A closer view of the site shows how the City of London constructed an extension of the VMP to connect with Clarke Road at the small orange circle. The large orange circle shows the location of the subject curves of Clarke Road where concerns were expressed about its safety.
This photo, taken on October 18, 2019, shows a video camera pointed toward the curves of Clarke. As per typical procedures developed by Gorski Consulting over the years, multiple, synchronized video cameras were positioned at strategic locations in the curves to capure important data. The traffic volume, speed and other characteristics were obtained from numerous video sessions completed between 2009 and 2019.

A variety of heavy trucks also originate from the City of London itself. Specialized traffic can include trucks hauling dangerous chemical and explosive materials. A large fuel storage facility has existed from many years at the intersection of Oxford Street and Industrial Road. Many fuel tanker trucks use Veterans Memorial Parkway and pass through the curves of Clarke Road north of Fanshawe Park Road on their travels to and from north of the City. It is imperative that trucks hauling these dangerous materials travel along safe routes designed for their use. The curves on Clarke Road are clearly not designed for such use.

Background

Gorski Consulting has been aware of the special traffic problems at the curves on Clarke Road north of Fanshawe Park Road for many years. Before the year 2005 this portion of Clarke Road had the worse road surface conditions in the area and this prompted Gorski Consulting to conduct some preliminary evaluations of instrumentation that could detect those surface deficiencies. Such experimentation eventually led to formalized procedures involving multiple video cameras along with the sensors of an iPhone attached to a test vehicle that objectively exposed those surface problems.

Another reason why Gorski Consulting was interested in the curves on Clarke Road is because, over many years of reconstructing motor vehicle loss-of-control collisions, it became obvious that roadway curves were an important causal factor in those events. Furthermore, roadway edge drop-off was another causal factor in these loss-of-control collisions and it became known that a prominent edge drop-off continued to reform, despite the City’s regrading efforts, because of the features of those curves.

This photo was taken on September 14, 2009, showing the extensive edge drop-off that existed at the northbound lane of Clarke Road in the area of the subject curves. Despite efforts by the City to cover the problem with re-distribution of the displaced gravel, the drop-off redeveloped on a regular basis.
Video documentations conducted Gorski Consulting in the fall of 2009 demonstrated that a number of vehicles were “falling off” the edge drop-off on Clarke Road with the potential of causing loss-of-control collisions. The example in this photo is a video frame taken from October 9, 2009.
Video documentations at the Clarke Road curves also captured dangerous circumstances such as this tanker truck, on October 9, 2009, that passed through the curves on the wrong side of the centre-line. Such actions were found to be a regular occurrence throughout the numerous video sessions performed over 13 years.

In the year 2008 the surface of Clarke Road was repaved. However the edge edge-drop continued to redevelop. This was not a surprise because vehicles continued to drop off the pavement surface regardless of the pavement condition. This was a matter of the higher speed of vehicles and the presence of both vertical and horizonal curves forming an unusual road character. Attempts to make the public aware of these potential problems were unsuccessful as no one in an official capacity wanted such safety issues to become public.

Early in the studies it was expected that loss-of-control events would be occurring at this site and this was confirmed by the finding of physical evidence along the roadsides. Yet nothing was ever officially reported about these happenings. As a result Gorski Consulting began documenting the physical evidence that was found and this continued for a full 10 years between 2009 and 2019. The documentations took place only within the curves which existed for only about 300 metres. The result of this work showed that 121 loss-of-control incidents were documented in that 10-year period, or about 1 incident per month.

Early attempts were made to examine where these events occurred and if a repetitive pattern could be established. These events were plotted on an aerial view of the site, shown below. This data shows the events up to the end of the year 2012.

No obvious pattern was observed in the location of the loss-of-control events as they appeared to be scattered randomly throughout the curves.

Attempts were also made to inquire from the City of London about what knowledge they had about these incidents. A Freedom of Information request was made of the City and they replied that no knowledge existed and the inquiry should be made to the London City Police. A further inquire to the police was complicated but eventually the police data was released. The result of comparing the Gorski Consulting data with the London Police data was reported in a Gorski Consulting website article in April of 2017. A passage from that article is reprinted below:

In 2019 Zygmunt Gorski was appointed to the City of London’s Transportation Advisory Committee and in about a similar time City Staff reports became public about studies on widening of Clarke Road and the building of an extension of the Veterans Memorial Parkway to connect with Clarke Road.

It was at this time that data became available about traffic volumes at the intersection of Clarke Road and Fanshawe Park Road. This intersection was only about 500 metres south of the curves where considerable data was gathered by Gorski Consulting. Additional video sessions were commenced by Gorski Consulting at the curves to understand the current traffic volumes and speeds at the site. In preparation for an upcoming meeting of the Transportation Advisory Committee Zygmunt Gorski asked that an agenda item be attached wherein the data from the curves at Clarke Road could be discussed with committee members. The City Clerk refused to allow the insertion of this item. As a result of this action Zygmunt Gorski submitted his resignation from the Committee. And it was only a few years later when essentially all citizen advisory committees were disbanded by the City.

The video sessions completed by Gorski Consulting in 2019 revealed that a very large increase in traffic volume had developed in comparison to the earlier data commencing in 2009. For northbound vehicles the traffic volume had increased by 50.5%. For southbound vehicles the traffic volume had increased by 46.0%. While this fact was posted in Gorski Consulting articles only a small number of visitors actually accessed those articles. None of this information was made available for the general public to consider.

The last data on the Clarke Road curves posted on the Gorski Consulting website was in the spring of 2020. At this time the Covid-19 pandemic was in full effect. It became of interest to know how traffic volumes and speeds were affected. So on March 27, 2020 another video session was conducted at the Clarke Road site and the results were combined with three other sites, as listed below:

Hamilton Road west of Gore Road in London

Highbury Ave at Commissioners Road in London

Highway 401 at Westminster Drive, south-west of London

The results for Clarke Road were in relation to a half hour time segment between 1600 and 1630 hours. This showed that the 2020 traffic volume had decreased marginally compared to the 2019 data. Similar effects were observed at the other sites so it was no just a unique situation at Clarke Road.

Vehicle speed data was also reported in the spring 2020 website article. In the year 2009 a 60 km/h speed advisory sign was posted at the curves. By October 2019 that speed advisory was lowered to 50 km/h. The data showed that the average speed of vehicles at the curves was 75.18 km/h in 2009 and the average speed was lowered to 72.75 km/h in October 2019. The data from March 27, 2020 showed an average speed of 74.57 km/h. All these speeds are obviously higher than the advised speed.

The site at the Clarke Road curves continued to be monitored by Gorski Consulting until the spring of 2022 when the study was finally discontinued.

Current Status of Clarke Road Site

On July 7, 2025 Gorski Consulting received the copy of a notice of complaint to the City of London from a resident who was responding to a collision on Clarke Road just south of Fanshawe Park Road. The general concern was about the traffic volume, including heavy trucks, and the resulting unsafe conditions at his residence. Gorski Consulting was notified because the complaining resident was aware that a substantial amount of data had been collected. In response to the notification Gorski Consulting attended the collision site and then re-examined the curves of Clarke Road. A large number of trucks were observed such that it appeared that the truck volume had increased from five years ago. We therefore made arrangements to conduct more video sessions to evaluate the current status of the site. Four, 1-hour video sessions were conducted at the following dates and times:

July 30, 1600 hours

July 31, 1300 hours

August 5, 0930 hours

August 7, 1100 hours

The data was summarized to determine the traffic volume and the volume of heavy trucks in each of the video sessions. Again, the summaries were with respect to one-hour time frames. The results are noted below:

July 30, 1600 hours: Total traffic volume = 1139 vehicles, Heavy truck volume = 80 trucks

July 31, 1300 hours: Total traffic volume = 595 vehicles, Heavy truck volume = 120 trucks

August 5, 0930 hours: Total traffic volume = 661 vehicles, Heavy truck volume = 129 trucks

August 7, 1100 hours; Total traffic volume = 676 vehicles, Heavy truck volume = 149 trucks

The 1139 vehicles observed on July 30th was the highest ever recorded in all the previous sessions going back to the first sessions in October, 2009. The 149 trucks observed on August 7 was the second highest ever recorded, surpassed only by the 152 trucks observed in a session commencing at 1357 hours on October 24, 2019.

However there were more details to these results. While completing the analyses of the video sessions it became apparent that the characteristics of the traffic units had changed. In the 2025 sessions there appeared to be many more dump trucks towing pup trailers. Also there appeared to be many more non-trucks, such as pick-ups, vans and SUVs that were hauling large trailers. Thus further analysis was conducted to explore these apparent changes.

A comparison was made with the data from July 30, 2025 commencing at 1600 hours with the same start time on October 27, 2009. We focused our documentations just on dump trucks. We counted how many dump trucks travelled through the site as single unit, without a trailer, and those dump trucks that were hauling a pup trailer. The results are noted below:

October 27, 2009: single unit dump trucks without trailers = 17, dump trucks hauling pup-trailers = 6

July 30, 2025: Single unit dump trucks without trailers = 7, dump trucks hauling pup-trailers = 17

So a reversal of characteristics occurred. In 2025 there were many more dump trucks hauling pup trailers while in the year 2009 it was the reverse.

We then did another comparison whereby we searched for a session completed in the month of July that would match the month of July in 2025. The found session took place on July 13, 2011 commencing at 1105 hours. The results from that session are noted below:

July 13, 2011: Single unit dump trucks without trailers = 13, dump trucks hauling pup-trailers = 1.

So the results were even more dramatic. Only one dump truck was observed hauling a pup trailer in the 2011 session. Yet in the 2025 session 17 dump trucks were observed hauling pup trailers.

Once again we conducted another comparison by looking at the data from August 7, 2025 where we observed a large number of trucks. The results are noted below:

August 7, 2025: Single unit dump trucks without trailers = 31, dump trucks hauling pup-trailers = 22.

Thus on August 7th there were many more observations of dump trucks and more of them were without pup-trailers. Yet 22 of those trucks were hauling pup-trailers which is higher than the July 30th data.

The comparisons also demonstrated a dramatic difference in the traffic volumes at 1100 hours between August 7, 2025 and July 13, 2011. Only 312 vehicles were observed passing through the curves in 2011 whereas in 2025 676 vehicle observations were made. So well over twice as many vehicles passed through the curves in 2025 in the same one-hour (1100 to 1200 hour) time frame.

In this example a pick-up truck is observed on July 30, 2025 hauling a substantial trailer. Such observations were much more common in the 2025 sessions than they were in earlier years.

Over the years residents at the noted curves have also had to deal with vegetation that continually blocked their view when exiting their driveways located on the east side of the road. Looking to the north bushes blocked the view and made it precarious to attempt a left turn. A number of years ago the City of London cut back those bushes but now they have reformed. It is clear that the City has neglected this problem for a number of years now.

Discussion

Overall, it can be said that the numbers of trucks in general increased during the 2025 video sessions but also that the trucks that were observed were also hauling more cargo because of the additional payloads of truck trains and pup-trailers. It is probable that further analysis will reveal that more cargo is also being carried by “non-trucks” hauling trailers but that analysis has not been done. Although no specific analysis had been completed, a review of the video sessions also suggested that there were many more “non-trucks”, such as pick-up trucks, vans and SUVs hauling various trailers, some of them large, through the curves in 2025.

During the long time of documentation of loss-of-control collisions at the Clarke Road curves no official mention was made by news media about any significant collisions. And to the present date Gorski Consulting is unaware of any official reports of significant collisions through the curves. Exploration of police reports and comparing those to the Gorski Consulting data showed that more than 80% the collisions/incidents documented by Gorski Consulting were unknown to police. It is possible that the results of some of the collisions on Clarke Road are only reported in Hospital emergency records but those are not available.

The very large number of cargo-carrying vehicles travelling through the curves of Clarke Road is unlikely to be affected by attempts to change transportation behaviour toward mass transit and active transportation. Regardless of how successfully the City of London manages to divert the population away from climate-changing, personal, motor vehicles there will always be a need to transport cargo, sometimes in very large quantities at once. So if cargo-carrying vehicles are diverted off of the Clarke Road curves they will have to go somewhere else; you cannot just make them disappear.

The City of London has had decades to consider how it should react to the existence of vehicles entering and exiting the Veterans Memorial Parkway at its north terminus and therefore where it meets with Clarke Road. Plans were publicized in 2019 about twinning the Clarke Road bridge over the Thames River just south of Fanshawe Park Road and therefore creating four lanes of traffic. But those “improvements’ will terminate at Fanshawe Park Road. Nothing has been mentioned about traffic problems developing on Clarke Road north of Fanshawe Park Road and particularly at its curves near there. Widening Clarke Road will only entice more traffic onto it and escalate the problems at the Clarke Road curves. A decision awaits but it cannot wait forever.

Many Involved In Suppressing Information About Cyclist Safety

This southbound cyclist was observed at approximately 1614 hours of July 30, 2025 riding along the curves of Clarke Road north of Fanshawe Park Road in the north-east area of London, Ontario. Within the half hour around this time 562 motor vehicles were observed passing through the curves, including 47 heavy trucks. Why was this cyclist riding here?

Many persons and organizations in the region of London Ontario are working hard to suppress information about cycling dangers that exist on local roads. Why this is happening is complicated. While there is considerable propaganda distributed throughout official circles that cyclist safety is an important matter, when it comes to actually implementing real solutions, that propaganda falls heavily short.

Why does this cyclist seem to be oblivious to the dangerous circumstances of riding in these curves of Clarke Road? There is no safe place for a tractor-trailer to pass the cyclist until the cyclist reaches Fanshawe Park Road which is another 500 metres to the south.

The example shown in the two photos in this article demonstrate the lack of recognition by cyclists to the dangers around them. Note that the cyclist in the above photos is not wearing a helmet and is carrying some kind baggage suspended from the left handlebar. Above all, cyclists need to understand that they need as much clearance from a passing motor vehicle as possible. Suspending baggage from a handlebar will reduce that clearance. And if the baggage becomes snagged with the passing vehicle a dangerous result will take place. But many cyclists do not comprehend that something loose and soft like a handbag could become snagged. And they do not appreciate that such limited snagging could have dire consequences. Such basic information is not passed onto unsuspecting cyclists because those who investigate cyclist collisions do not pass on their findings to the cyclists who need to know.

Many cyclists develop a blind faith in the belief that the government is there to protect them. So when the Ontario Provincial government introduced legislation a number of years ago that required motor vehicles to stay a lateral distance of 1 metre away from a cyclist this was one of the ways in which cyclists were lulled into a sense of imaginary safety. Cyclists would now be protected because if a motor vehicle driver killed them the driver would be in the wrong. And the driver could go to jail. Too few understand that the value of the door prize won by being right and dead is not worth dying for.

Ontario Law Removing Toronto Cycling Lanes Found Arbitrary And Against Cyclists’ Charter Rights

This cycling lane on The Esplanade in downtown Toronto Ontario carries cyclists safely through the city. The Ford government enacted legislation that would remove select bike lanes from downtown in the expressed belief that they were causing traffic congestion. That view was overturned by a recent court decision.

In a decision released on July 30, 2025, Justice Paul B. Schabas, of Ontario’s Superior Court of justice struck down the Ford government’s Bill 212 which was to remove certain bike lanes within downtown Toronto as the government stated that those cycling lanes were responsible for traffic congestion. In the noted judgment (Cycle Toronto et. al. vs Attorney General of Ontario et. al.) Justice Schabas found that the government bill infringed on cyclists’ rights to life and security entrenched in the Canadian Charter of Rights. Justice Schabas further found that the Government of Ontario provided no satisfactory proof that the cycling lanes were leading to traffic congestion. Meanwhile a number of experts who testified at the hearing explained that, by their presence, cyclists removed motor vehicles from roads and therefore reduced traffic congestion.

Information and evidence was supplied to Justice Schabas from a number of organizations and researchers including:

The Association of Municipalities of Ontario

The Ontario Traffic Council

Ontario Professional Planners

Physicians/Researchers from University of Toronto

Ontario Society of Professional Engineers

Toronto Parking Authority

Toronto’s City Manager

Mayor of Toronto

Canadian Automobile Association

CIMA Engineering Firm

Dr. Linda Rothman, Toronto Metropolitan University

Barry Raftery, Professional Engineer

Dr. Murtaza Haider, Toronto Metropolitan University

Dr. Shoshanna Saxe, University of Toronto

Toronto Cycle

And unidentified others were noted in Justice Schabas’ decision.

There were a number of cycling “facts” reported in Justice Schabas’ decision that need confirmation. For example in a May 2024 report authored by the City of Toronto claimed that “There has been a reduction in traffic accidents involving cyclists”. It has been a long-standing observation by Gorski Consulting that the occurrence of cycling collisions is poorly documented. While cyclist collisions with motor vehicles may be officially documented in police reports if a cyclist is injured, many cyclist collisions do not involve motor vehicles and many cyclist injuries are not officially documented unless a cyclist attends a hospital emergency department. Even in those instances where cyclists are treated at emergency departments, there is minimal or no flow of data from those hospitals to public entities that inform the general public about the status of those incidents. So claims about cyclist collision and injury reduction need to be treated with caution.

The same City of Toronto report was also quoted by Justice Schabas about increases of cycling volumes on the Yonge Street bike lanes. It was stated that the City of Toronto observed an increase in cyclist volumes from between 57% and 180%, which resulted in the Yonge Street cycling lanes becoming permanent. While this data may be accurate one cannot examine how those conclusions were drawn as it is unknown how the data was collected and how reliable the process was. Cities often use the results from automated bike counters imbedded in the surface of a cycling lane but no one has provided an independent confirmation of the accuracy of those counters. In many instances observed by Gorski Consulting cyclists travel randomly into and out of cycling lanes and those riders are missed in the data collections. And it remains unknown exactly how accurately the imbedded sensors are capable of differentiating cyclists from other implements of transportation such as e-scooters or pedestrians walking with carts or other devices. Again, it is important to take a critical look at such data before it is accepted unconditionally.

An example of data that may be misrepresented comes from a memo written on X (Twitter) by Premier Ford on October 23, 2024. There he claimed that “The 1.2 per cent of people who commute by bike shouldn’t be clogging primary roads for the over 70 per cent of people who drive. It’s just common sense”. Justice Schabas noted that the Applicants (Toronto Cycle et. al.) made a request under the Freedom of Information Act “…for records or documents supporting the 1.2% figure used by the Premier”. Justice Schabas noted “…the response from the Ministry of Transportation was that no records were found that were responsive to the request”.

Justice Schabas went on to clarify that

“…the Ministry of Transportation had quite different information at the time which it released on December 18, 2024. The Ministry’s Transportation Tomorrow Survey found that in 2022 4.4% of all trips within the City were taken by bicycle or other micromobility. This compared to just under 60% for automobiles, including passengers and taxi/rideshare trips. The percentage of trips by bicycle or other micromobility rose to 9.3% for trips to downtown Toronto. This can be compared to 28.4% who used automobiles for trips to downtown Toronto in 2022. For trips between Bloor West wards and downtown, the cycling figure was 15%.

So was Ford’s 1.2% real or was it fake? Where did this number come from? A Premier of Ontario has a duty to report correct facts. Especially when he is deemed by the public to have access to detailed information from the numerous personnel who work in his ministries. Will this assertion ever be clarified for public consideration?

Our collective, and unfortunate, circumstance is that the current status of our society is in the grasp of Donald “Trumpism”. It becomes a common theme that when scientific and unbiased data is available, Trumpists use a loud voice to impress voters with “fake news” about what voters would like to hear. With respect to traffic congestion a large percentage of drivers are frustrated with it and are prime to hear Ford’s loud commitment that he will save them from their difficulties and the scapegoat, cycling lanes, are to blame. It is with detailed facts that Justice Schabas has explained that there is no factual connection that traffic congestion is caused by cycling lanes and this fact can be concluded from the many presentations made to him by experts from a wide variety of organizations.

Justice Schabas also made reference to a November 13, 2024 report by Toronto’s City Manager. Justice Schabas noted

The November 13, 2024 Report identified a number of impacts that would result from the removal of the target bike lanes. This included reduced safety for cyclists, increased collision risk for drivers, and “minimal improvements in travel time once lanes are removed.” The Report estimated a cost of $48 million to remove the recently constructed bike lanes, in addition to the $27 million spent by the City to build them, noting that their removal will be complex and negatively impact driver travel time and businesses during construction.

The City Manager observed that over the past ten years, 28 people have been killed and 380 people seriously injured while cycling, and that 68% of these collisions took place on streets without safe cycling accommodation. However, serious injuries and fatalities for people cycling has “generally been decreasing” as ridership has increased. The City Manager noted that “independent peer-reviewed research has shown that the introduction of separated bikeways reduces the risk of cycling injury (about 9 times lower risk than a major street with parked cars and no cycling infrastructure).”

Again, there are a number of “facts” reported in the City Manager’s report. How those facts were generated must be considered before they are accepted unconditionally. It was stated that “independent peer-reviewed research has shown that the introduction of separated bikeways reduces the risk of cycling injury (about 9 times lower risk than a major street with parked cars and no cycling infrastructure).” But how was that data collected and how reliable were the conclusions based on this peer-reviewed research? Once something is described as “peer-reviewed” much of the attention toward the details is taken away, not always with justification. Those global comments need to be researched to confirm that they represent reality. One would not want to believe that research peers are somehow compromised yet a naïve belief that all research is uninfluenced by entities that sponsor it ripens one’s acceptance to swallow its poison. All persons, including those with grandiose titles, official robes and honors are capable of being biased. In fact those titles, robes and honors can service the purpose of hiding bias, and that includes judges.

However, having reviewed Justice Schabas’ decision, there is nothing that suggests any form of bias. Indeed, Justice Schabas’s focus on objective fact is impressive. The decision is well grounded on the foundation of the many comments made by experts from a wide range of organizations who told him that removal of the bike lanes would be dangerously harmful to the cyclists who use them and that cyclists will continue to ride on those arterial roads due to necessity.

The Ford government knew that if they removed cycling lanes in downtown Toronto this would increase the likelihood that some cyclists would be injured or killed. This is why they also introduced legislation to prevent cyclists from suing the government, an act that, by all reason, should have been illegal.

The Ford government’s argument is that they are not against cycling lanes, they are only against cycling lanes being placed on arterial roadways such as Bloor, University and Yonge Streets in downtown Toronto. Their argument is that cycling lanes should exist along secondary roadways, next to the arterials, and that this will cause cyclists to use those secondary roadways to reach their destinations. This argument is a clever falsehood. It implants the notion that cyclists using the cycling lanes on the arterials roadways can just as easily divert to the secondary roads and that such a redirection of cyclist traffic will be successful.

Studies by Gorski Consulting in London Ontario have examined roadways where cycling lanes were built next to arterial roadways, presumably for the same belief that those cycling lanes will divert cycling traffic from the arterials. Photographic observations of cyclists shows that cyclists continue to ride along those arterial roadways, often on sidewalks, or even riding the wrong way on a single-way cycling lane. Our impression is that cyclists avoid riding a block, two or more away the the straightest route to their destination. This is because cycling takes muscular effort and energy that is not expended by occupants of motor vehicles so that direct routes are very important to cyclists. The Ford government’s argument that cyclists make that choice by themselves is akin to setting up a mouse trap and blaming the hungry mouse for choosing to kill itself when food could be found elsewhere. As a government you know what cyclists are likely to do despite what the laws may say and when you blame the law breakers for failing to follow the law you fail to consider whether the law is improper in its intended purpose.

Removing the arterial road cycling lanes will have a very serious consequence to cyclists, some of whom will pay for the government’s decision with their lives. This lack of respect for human life is balanced on the grounds that certain motor vehicle drivers might gain a short time advantage of a few minutes in their driving time. Thankfully, Justice Schabas was aware of this issue and was unbiased enough to call the matter as it actually stood. Regrettably the Ford government has announced that it will use public taxes to appeal this verdict leaving it to an unpredictable outcome.

Hwy 402 Shut Down A Second Time Due To Surface Problems

For a second time in just over a month Highway 402 east of Sarnia Ontario has been reportedly closed due to road surface problems. Official news media have been reporting that the problems were created by “extreme heat” but review of recent temperatures suggests that seems doubtful.

Why has Highway 402 been shut down a second time in just over a month near Sarnia Ontario? The public has been told it is due to extreme heat conditions which have damaged the road surface. While anything is possible and high heat often exists in summertime, it is doubtful that temperatures have been any more extreme than what typically occurs.

In a CTV News article posted on June 23, 2025 it was reported that unsafe road surface conditions occurred in the westbound lanes between Oil Heritage Road and Mandaumin Road. No explanation was provided by the Ontario Ministry of Transportation which is responsible for the highway maintenance. A photo was shown of a surface disruption that appeared to be at the junction of two concrete slabs. It was speculated that concrete expansion due to high heat caused the condition. It is not clear why the expansion would have occurred at this specific site as opposed to any other which should have sustained similar temperature conditions.

No further discussion was made public until July 28, 2025 when CTV news reported that another road surface problem occurred in the eastbound lanes within a few kilometres of the previous problem a month earlier. A photo displaying the surface showed an upheaval which appeared to be on an asphalt surface. Once again the explanation was “extreme heat” caused the problem. Again, it is not clear why this could be true as recent temperatures seemed to be similar to what typically occurs in summertime in the region.

Historically, Highway 402 had its share of unusual road surface problems, In the late 1970s, as Highway 402 was just completed west of Strathroy, a major surface upheaval occurred in the eastbound lanes just at the east end of the newly completed highway. This existed for several kilometres. The problem was blamed on a concrete underlayer beneath the asphalt paving and a long section of the surface had to be torn up and reset. For many months huge mounds of broken concrete and asphalt were seen piled up along side the highway which were eventually disposed of.

In the spring of 2019 the Ontario Provincial government announced a pilot study where they were going to increase the speed limit on several sections of expressways including a section of Highway 402. The limit was going to be increased from 100 to 110 km/h. That pilot study eventually turned into a permanant change along Highway 402.

While this speed limit change was being proposed Gorski Consulting observed that the road surface along several segments of Highway 402 appeared to be substandard. Testing was being conducted by Gorski Consulting in the spring of 2019 along several expressways and it was decided that the testing would include the segment of Highway 402 between London and Strathroy. This testing demonstrated that the surface of Highway 402 was in worse condition compared to other freeways in the region. This finding was reported in a Gorski Consulting website article of February 5, 2020 entitled “Testing Shows Safety Differences in Ontario’s Expressways”.

In another article posted on June 13, 2019 (“Drivers Beware – Road Data Shows Important Differences in 400 Series Highways in Southwestern Ontario”) we provided some details of the testing. A large portion of this article is reproduced below:

Westbound lanes of Highway 402 on approach to Olde Drive overpass.
Westbound lanes of Highway 402 on approach to Olde Drive overpass.
Westbound lanes of Highway 402 just past Olde Drive

Highway 402 has not been ridden in the past few years west of Strathroy so the surface conditions are unknown. Consequently it is unknown if the road surface problems alleged to come from “extreme heat” are accurate or if other factors may be at play. Certainly high heat is experienced frequently in summer months along Highway 402 and there is no indication that this season has been much different from previous seasons.

In another article posted by CTV News on July 29, 2025 the Mayor of Sarnia has questioned the accuracy of the extreme heat source. Mayor Bradley was quoted as follows:

Archives

Recent Posts