by Zygmunt Gorski | Jul 1, 2023 | News
Unfortunate circumstances caused the lack of involvement by Gorski Consulting in the public participation meeting regarding the long-term use of Blackfriars Bridge in London, Ontario. However positive developments have taken place in other areas of study such as the...
by Zygmunt Gorski | Jun 11, 2023 | News
In a report to the City of London dated May 31, 2023, Dillon Consulting described its investigations with respect to the long-term usage of the Blackfriars Bridge located just northwest of downtown London, Ontario. These investigations were conducted in the spring and...
by Zygmunt Gorski | Aug 16, 2022 | News
Results from Session #5 of the Blackfriars Bridge Traffic Study are now available in this current article. Gorski Consulting continues to gather data from the Blackfriars Bridge Traffic Study (BBTS) in London, Ontario. A fifth videotaping Session was conducted on...
by Zygmunt Gorski | Aug 11, 2022 | News
Preliminary results are now available from Session #5 of the Blackfriairs Bridge Traffic Study (BBTS) with respect to the number of observed motor vehicles and their speeds. The analysis is incomplete such that the only speeds available are those as eastbound vehicles...
by Zygmunt Gorski | Aug 10, 2022 | News
Sun and shade were found to be significant issues during the latest videotaping session of the Blackfriars Bridge Traffic Study. This view, taken at approximately 0843 hours, is looking east over the Blackfriars Bridge. Although the brake lights of a car are visible,...